Lift & Shift

Lift and shift to OCI, the fastest route off ageing hardware.

When the priority is getting off the data centre clock, a lift and shift carries your estate to OCI as is. We move it cleanly, prove it works, and leave the door open to optimise once it is running.

Rows of servers in a data centre representing a lift and shift to OCI
Overview

The short version.

Lift and shift is the simplest way to move a workload to OCI. The application, the database, and the operating systems come across with minimal change, so the risk is low and the timeline is short. It is the right first step when a hardware refresh is looming, a lease is ending, or a data centre is closing and the calendar will not wait.

We do not treat lift and shift as the finish line. We carry the estate over with a tested cutover, then use the run period to find the right shapes, the storage tiers, and the scaling rules that bring the monthly cost down. The move buys you time. The optimisation that follows buys you savings.

Why OCI

Why teams move this to OCI.

Speed off the floor

A like for like move avoids redesign, so you exit ageing hardware in weeks rather than quarters.

Low change risk

Carrying the workload over as is keeps the application behaviour identical, which keeps testing simple and rollback clean.

A base to optimise from

Once it runs on OCI we right size shapes, schedule non production, and tune storage to cut the bill.

Placement

How the options compare.

Lift and shift sits at one end of a spectrum. Knowing where your workload belongs on that spectrum stops you from overbuilding or underbuilding the move.

ApproachBest whenTrade off
Lift and shiftA deadline is fixed and the estate is stableCarries existing inefficiency until you optimise
Move and improveThere is room to right size during the moveSlightly longer timeline, lower run cost sooner
Re architectThe application can adopt managed and cloud native servicesLargest effort, largest long term payoff
Lift and shift is not the cheapest way to run on OCI. It is the fastest way to get there, and the right place to start optimising from.
Method

How we run the move.

  • Inventory the estate, dependencies, and the deadline driving the move.
  • Size matching OCI shapes and confirm the licensing and BYOL position.
  • Build the landing zone and replicate workloads with tested data sync.
  • Validate against real traffic, then cut over with a rollback plan ready.
  • Decommission the old hardware once the new estate is proven stable.
  • Begin the optimisation pass to right size and cut the monthly run cost.
40%
average OCI spend reduction after optimization
500+
OCI engagements delivered
24/7/365
managed monitoring and support
20+
years combined Oracle experience
Related

Where this connects.

Service

OCI Implementation & Migration

The team that plans and runs the move end to end.

See implementation
Service

OCI Cost Optimization

The optimisation pass that follows a lift and shift.

See optimization
Workload

App Modernization

When the next step is improving the application, not just moving it.

See modernization

Plan the move before you commit.

Most teams bring in a specialist before they fix a region, a shape, or a credits number. Book an assessment and get a written plan with options and a price.